From the beginning of the project, Surefoot was assigned as the footing for the construction of the modules of a remote Hospital far north Queensland. Because the structure was intended for public use, the loadings of the structure were taken into account when doing the design according to AS 1170.1. These loadings were confirmed by the engineering team at Surefoot after the project was issued by the Structural Engineer.
remote hospita 1
Kompian Hospital PNG.jpg 4

Once the structure was awarded to the winning tenderer, the installation started by the contractor with training provided by Surefoot. The estimated installation time of 28 days was cut to just 14 days.